PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

After pouring concrete at underground service pipes Facing South (800x600).jpg Backfilling inside Stair -5 pit Facing North (800x600).jpg Building rebar mats for Elev. 1,2,3 (3rd Floor) Facing East (800x600).jpg Finished installing shear wall panels at Elev. 4-Stair -2 (3rd Floor) Facing South-West (800x600).jpg Installed electrical panels on the 2nd floor Facing North (800x600).jpg View of the steel arch from the 2nd floor Facing East (800x600).jpg
Previous pageNext page Installed electrical panels on the 2nd floor Facing North (800x600)
Installed electrical panels on the 2nd floor Facing North (800x600)